So here it is May already and an early breakup and the temp are warming up. All the snow is gone, at least locally and nothing left for riding even in the mountains.
I did get two late season trips into the cabin, one with Jake and one with Tyler. Hauled in two of the three base cabinets for the kitchen and the counter. Just need to get the third one in so I can cut out the hole for the sink and place it. Sure would be nice to have a kitchen counter and sink instead of the bowls I’ve been using for doing dishes.
Tyler and I finished up the tongue and grove on the main walls and on the nest trip I plan to finish the back wall and if I’m lucky or motivated enough I’ll start on the ceiling. Really need to use up the material I have hauled in so I can get a good list going for next winter. I do have all the materials for an outhouse and that will be a priority, just as soon as I get a hole dig for it.
For work I’ve been working on my CCNA and HAM radio license. Got my HAM license,KL4GO, And can get on the air just as soon as my radio is installed in the truck this week.
Of course now that it is Spring. it’s time to get the ATV’s ready and rolling.
Share on Facebook